CASE STUDY –
VICTORIA RE-SIGNALLING PHASE 3
Client – Siemens mobility limited
Location – London
Duration – 2.5 Years
​
​
SCOPE OF WORKS
​
-
A new PSP located at Queens Road Substation area with power obtained from the existing Auxiliary Transformers (AT) (subject to confirmation of suitability at GRIP 4) and modification of the existing DNO. The PSP shall be based on a single UPS system and new 200A LVAC panel. New Auto Reconfiguration equipment shall be installed within the PSP with the ability to support 6No. feeders (4No. fully populated 2No. spare space) and a PMS.
-
A new PSP located in close proximity to Wandsworth Common Substation with power obtained from two new 140kVA Auxiliary Transformers (AT). The PSP shall be based on a 3panel LVAC panel with 1No. suitably sized UPS system located within the PSP and provided with enough power supplies to back feed the existing LVAC circuits. New Auto Reconfiguration equipment shall be installed within the PSP with the ability to support 6No. feeders (4No. fully populated 2No. spare space) and a PMS.
​
-
A new PSP located in close proximity to Streatham Substation with power obtained from two new 140kVA Auxiliary Transformers (AT) (subject to confirmation of suitability at GRIP 4). The PSP shall be based on a 3panel LVAC panel with 1No. suitably sized UPS systems located within the PSP and provided with enough power supplies to back feed the existing LVAC circuits. New Auto Reconfiguration equipment shall be installed within the PSP with the ability to support 9No. feeders (6No. fully populated 3No. spare space) and a PMS.
​
-
New 400v/650v switchgear to be accommodated in Tulse Hill Substation (subject to confirmation of suitability at GRIP 4) with power obtained from the existing 140kVA Auxiliary Transformers (AT) (subject to confirmation of suitability at GRIP 4). The PSP shall utilise the existing 3 panel LVAC (subject to confirmation of suitability at GRIP 4) with 1No. suitably sized UPS systems located within the substation and provided with enough power supplies to back feed the existing LVAC circuits. New Auto Reconfiguration equipment shall be installed within the PSP with the ability to support 9No. feeders (1No. fully populated 6 No reserved for VIC Phase 4 2No. spare space) and a PMS.