Kent PHK Go Electric

Kent PHK have an ambitious target of reducing our carbon emissions by 30% over a 10 year period by 2024, or year 5 of CP6. Just over half way into our target we have made significant progress by monitoring all areas of the business and making positive changes to introduce efficiencies and improvements such as:- In our Premises Installation of solar panels Installation of LED lighting controlled by movement sensors Alteration to our heating and ventilation systems These changes have yielded a 33% reduction in property carbon emissions Our Vehicle Fleet Running a fleet of vehicles no older than 5 years to ensure the vehicles are using the latest fuel efficient engines

Recent Posts
Archive

6E Langlands Square, Kelvin South Business Park, East Kilbride, Glasgow, G75 0YY

Tel: 01355 230 005
Tel: 01623 421 202
Kent House, Lower Oakham Way, Mansfield, Nottinghamshire, NG18 5BY

The Kent Group includes Kent PHK L.t.d. / Kent PHK (Scotland) L.t.d. /  IHC Engineering (UK) L.t.d.

KG Switchgear / Amigo Hire