CASE STUDY

BIRMINGHAM NEW STREET AREA RESIGNALLING PHASE 7

PROVIDING SPECIALIST SIGNALLING POWER EXPERTISE TO SUPPORT THE MODERNISATION OF ONE OF THE UK'S BUSIEST RAILWAY STATIONS

CLIENT
Siemens Mobility

LOCATION
Birmingham, UK

DURATION
3 Years

SERVICES
Design | Engineering | Manufacturing | Electrical | Test & Commissioning

OVERVIEW

Appointed by Siemens Mobility as a specialist delivery partner, Kent Group played a key role in the Birmingham New Street Area Re-signalling Phase 7 programme, delivering critical signalling power infrastructure within one of the UK's busiest and most operationally demanding railway stations. Over a three-year programme, our specialist engineering teams supported the modernisation of the station's ageing signalling power network, helping to provide the resilient electrical infrastructure required for future railway operations.

​

Working within a live operational railway, Kent Group delivered new Principal Supply Points (PSPs), Functional Supply Points (FSPs), 650V signalling power feeders, DNO connections and associated power infrastructure. Through close collaboration with Siemens Mobility and Network Rail, the project successfully introduced a more resilient, automatically reconfigurable signalling power network while maintaining operational continuity throughout the programme.

BNS.png

PROJECT BY NUMBERS

3

Years

4

PSP Buildings

11

650V Feeders

31 Million

Annual Passengers

31

Functional Supply Points

1

DNO Supply

THE CHALLENGE

One of the UK's busiest railway stations

Delivering critical signalling power upgrades while supporting continuous railway operations.

Legacy Infrastructure

Integrating new signalling power systems with infrastructure that had been in operation for more than five decades.

Operational Continuity

Carefully phased commissioning to maintain power availability throughout delivery

Collaborative Delivery

Working as a specialist delivery partner within Siemens Mobility's wider programme team.

THE SOLUTION

Kent Group delivered the specialist signalling power infrastructure required to support Birmingham New Street Area Re-signalling Phase 7.

 

This included the installation of new Principal Supply Points, Functional Supply Points, upgraded 650V signalling power feeders, DNO supplies, alarm and indication systems, and modifications to existing power infrastructure.

 

Automatic Reconfiguration technology was introduced to improve network resilience, reduce downtime and enhance the operational flexibility of Birmingham's signalling power network.

SCOPE OF WORKS

  • Electrical Design

  • Principal Supply Point Manufacture

  • Functional Supply Points

  • DNO Connections

  • 650V Feeders

  • Power Management Systems

  • Auto Reconfiguration Equipment

  • Cable Infrastructure

  • Testing

  • Commissioning

CLIENT BENEFITS

Improved Operational Resilience

Intelligent power monitoring

Reduced Maintainance Risk

Increased Future Capacity

Future-proof power infrastructure

Safe delivery within a live operational railway

 

 

""Projects like Birmingham New Street demonstrate the value of specialist expertise within major railway programmes.

 

Working alongside Siemens Mobility, our role was to deliver the signalling power infrastructure that underpins the wider re-signalling works, helping to improve resilience at one of the UK's busiest railway stations.

 

Success on programmes of this nature is built on technical expertise, careful coordination and strong collaboration, and I'd like to thank Siemens Mobility and Network Rail for the positive working relationships that contributed to a successful outcome."

​

Robert Kent

Operations Director

DIRECTORS STATEMENT

PROJECT GALLERY

DOWNLOAD CASE STUDY (PDF)

Get the full project overview in printable format

Kent PHK Ltd Block
KG Switchgear_Block
KG Fabrications_Block
Amigo Hire

The Kent Group includes

Kent PHK Ltd / Kent PHK (Scotland) Ltd / KG Switchgear Ltd / KG Fabrications / Amigo Hire

  • Linkedin

© 2026 by Kent PHK Ltd

Terms & Conditions

bottom of page