CASE STUDY

EAST MIDLANDS
PSP RENEWALS

DELIVERING RESILIENT POWER INFRASTRUCTURE THROUGH FULLY INTEGRATED TURNKEY DELIVERY

CLIENT
Network Rail

LOCATION
East Midlands Route

DURATION
2 Years

SERVICES
Design | Engineering | Civil | Manufacturing | Electrical | Test & Commissioning

OVERVIEW

Kent Group successfully delivered the East Midlands PSP Renewalsproject in collaboration with the Network Rail East Midlands E&P Route Engineering team.
Delivered over a two-year period from contract award through to final entry into service, the programme involved the turnkey renewal of three critical Principal Supply Point (PSP) sites across the East Midlands route:

Uttoxeter–30kVA UPS / 88kVA Generator
Market Harborough–40kVA UPS / 88kVA Generator
Syston–80kVA UPS / 145kVA Generator

The project formed part of Network Rail’s CP6 renewals work bank, with the objective of improving the long-term reliability, resilience and maintainability of critical signalling power infrastructure.

IMG-20250709-WA0099_edited.jpg

PROJECT BY NUMBERS

2

Years

3

PSP Buildings

0

Accidents

30-80kVA

UPS Systems

3

DNO Supplies

0

Lost Time Injuries

THE CHALLENGE

Multi-site Programme

Managing three complex renewals across multiple operational locations.

Live Railway

Maintaining operational signalling power throughout delivery.

Complete Integration

Coordinating civil, electrical, mechanical and DNO interfaces.

Programme Certainty

Delivering every stage through one integrated team.

THE SOLUTION

Kent Group delivered a complete turnkey solution encompassing civil, electrical and signalling design, procurement, in-house manufacture of Principal Supply Points, site clearance, foundations, compound construction, DNO coordination, installation, testing and final commissioning. By integrating every discipline within one delivery team, the programme achieved safe, efficient delivery while maintaining operational railway performance.

SCOPE OF WORKS

  • Civil Engineering Design

  • Electrical Design

  • Signalling Design Coordination

  • Principal Supply Point Manufacture

  • Site Clearance

  • Foundations

  • Roads & Compounds

  • DNO Connections

  • Building Installation

  • Electrical Installation

  • Testing

  • Commissioning

CLIENT BENEFITS

Improved Operational Resilience

Multi-disciplinary delivery

Reduced Maintainance Risk

Increased Future Capacity

Future-proof power infrastructure

Single Point of Accountability

 

 

"The East Midlands PSP Renewals programme perfectly demonstrates what Kent Group is capable of delivering. Successfully completing a multi-site programme of this scale required exceptional collaboration, engineering expertise and careful coordination across every discipline.

 

From initial design through to in-house manufacture, civil construction, electrical integration and final commissioning, every team played a vital role in the successful delivery of these critical infrastructure upgrades.

 

I’m incredibly proud of the professionalism and commitment shown throughout the programme and would like to thank Network Rail for their collaborative approach and the trust they placed in Kent Group. Together, we've delivered infrastructure that will improve the resilience and reliability of the railway for many years to come."

​

Tom Kent

Commercial and Planning Director

DIRECTORS STATEMENT

PROJECT GALLERY

DOWNLOAD CASE STUDY (PDF)

Get the full project overview in printable format

Kent PHK Ltd Block
KG Switchgear_Block
KG Fabrications_Block
Amigo Hire

The Kent Group includes

Kent PHK Ltd / Kent PHK (Scotland) Ltd / KG Switchgear Ltd / KG Fabrications / Amigo Hire

  • Linkedin

© 2026 by Kent PHK Ltd

Terms & Conditions

bottom of page