top of page
Kent_Group_Logo_White_HighRes.png
Victoria-station-aerial-view-1920-x-1280.jpg

CASE STUDY

VICTORIA RE-SIGNALLING
PHASE 3

PROVIDING SPECIALIST SIGNALLING POWER EXPERTISE IN SUPPORT OF ONE OF THE UK's LARGEST RAILWAY MODERNISATION PROGRAMMES

CLIENT

Siemens Mobility

LOCATION

London, UK

DURATION

2.5 Years

SERVICES

Design | Engineering | Manufacturing | Electrical | Test & Commissioning

OVERVIEW

PROJECT BY NUMBERS

As part of the Victoria Area Re-signalling Programme, Kent Group was appointed by Siemens Mobility to deliver specialist signalling power infrastructure works in support of one of the UK's largest railway modernisation programmes.

 

Delivered over a 2.5-year period, our scope focused on the design integration, manufacture, installation and commissioning of critical signalling power assets across multiple operational locations within the Victoria route.

​

Working collaboratively as part of Siemens Mobility's wider delivery team, Kent Group provided the specialist electrical engineering expertise required to successfully integrate new Principal Supply Points (PSPs), Functional Supply Points (FSPs), DNO supplies and associated signalling power infrastructure into a live operational railway. Through careful planning, close collaboration and disciplined delivery, the project enhanced network resilience while supporting the successful delivery of the wider Victoria Re-signalling Programme.

Vic-3-map-latest-v1-1536x1080-1.jpg

2.5

Years

24

Functional Supply Points

4

6

PSP Buildings

DNO Supplies

0

7km

Accidents

Cable Installed

THE CHALLENGE

Live Railway

Maintaining operational signalling power throughout delivery.

​

Future Network Capacity

Designing infrastructure capable of supporting future phases of the Victoria Re-signalling Programme through spare feeder capacity and auto reconfiguration systems.

​

Stakeholder Collaboration

Working closely with Siemens Mobility and Network Rail to coordinate engineering, commissioning and staged delivery.

CLIENT BENEFITS

Improved Operational Resilience

Improved power management

Reduced Maintainance Risk

Increased Future Capacity

Future-proof power infrastructure

Safe delivery within a live railway

THE SOLUTION

Kent Group delivered a comprehensive signalling power solution comprising four new Principal Supply Points, six new DNO supplies, twenty-four Functional Supply Points, new 650V feeder arrangements and approximately seven kilometres of signalling power cabling. The programme also incorporated Auto Reconfiguration equipment and Power Management Systems (PMS/SCADA), providing enhanced monitoring, operational flexibility and resilience while creating capacity for future expansion.

"Successful rail infrastructure programmes are built on strong partnerships.

 

Victoria Re-signalling Phase 3 is a great example of how specialist expertise, close collaboration and a shared commitment to delivery can achieve outstanding results. Working alongside Siemens Mobility, we were able to provide the signalling power expertise needed to support this important programme, helping to deliver infrastructure that will improve the resilience and performance of the railway for years to come.

 

I'd like to thank Siemens Mobility and Network Rail for the collaborative approach taken throughout the project, which was fundamental to its success."

Tom Kent

Commercial and Planning Directo

DIRECTORS STATEMENT

SCOPE OF WORKS

  • Electrical Design

  • Principal Supply Point Manufacture

  • Functional Supply Points

  • DNO Connections

  • 650V Feeders

  • Power Management Systems

  • Auto Reconfiguration Equipment

  • Cable Infrastructure

  • Testing

  • Commissioning

PROJECT GALLERY

bottom of page